Commercial Renovation in Greater Montréal

Commercial renovation is work on premises that already exist and already have a history: an office, shop, restaurant or clinic that needs a new layout or new finishes, often while the business has to stay open. The starting point isn't a blank shell. It's existing walls, existing services and existing code conditions, and the job is to change them without losing what's already working.

What commercial renovation covers

We renovate and reposition existing commercial premises across Greater Montréal: for owners who occupy their own buildings, for landlords and property managers working on the parts of a building they control, and for businesses that want their space brought up to date without moving. The common thread is that the space is already built and, more often than not, already in use.

  • Offices and workplaces renovated in place
  • Retail stores and boutiques, including storefront design
  • Restaurants, cafés and medical or dental clinics
  • Renovations in occupied premises, phased around operations
  • New layouts, finishes and custom millwork
  • Construction drawings and permit coordination

Commercial renovation or tenant improvement?

The two look alike on the job site, but they start from different questions. A tenant improvement fits out a leased space for the tenant moving in or expanding: the lease, the landlord's approval and the base-building rules set the limits, and the opening date sets the clock. Commercial renovation, as we use the term, is about the premises themselves: improving an office, shop, restaurant or clinic you own or already occupy, or refreshing a business that's staying put. If you're a tenant preparing a newly leased space, the tenant-improvements page is the one written for you. If you own, manage or already operate from the premises, this one is.

Starting from existing conditions

Most renovation surprises are already sitting in the building: services that don't match the old drawings, partitions that turn out to be fire separations, a floor that isn't level, an entrance that falls short of current accessibility expectations. We start with a site survey of the premises, including what can be seen behind the finishes, so the design is drawn around the real building rather than an assumption about it.

Opening up an older space may require bringing exits, fire separations and accessibility up to current code, and a change of use can bring requirements of its own. We flag these at the start, while they're still a design decision and not a change order on site.

Regulated trades (plumbing, electrical, ventilation, sprinklers and fire alarm) are carried out by licensed specialized subcontractors, whom we select, coordinate and schedule. IN Design & Construction carries out its projects under its own RBQ licence.

How a commercial renovation runs, step by step

1. Assessment and site survey. We walk the premises, document existing conditions, and pin down what the space needs to do, and what has to keep running while the work is done.

2. Concept. Layout, finishes and the main design moves are developed in-house and priced as they're drawn, so the concept you approve is one the budget can actually carry.

3. Plans and specifications. The approved concept becomes construction drawings: the drawings and specifications that the permit application, the subcontractors' bids and the site itself all work from.

4. Permits. We prepare and file the application and answer the borough's or municipality's questions. Where a storefront or façade is involved, PIIA design review may have to come first, so it goes into the schedule from day one.

5. Construction. Demolition, build-out and finishes are sequenced zone by zone when the premises stay in use, with the trades coordinated by our site team and regular reporting on schedule and budget.

6. Handover. A final walk-through, a deficiency list closed out item by item, acceptance of the work and, when the use or the operator changes, the certificate of occupancy the space needs before it reopens.

Renovating while the business stays open

Much of this work happens in occupied premises (en milieu occupé): a store that keeps selling, a clinic that keeps seeing patients, an office whose team keeps working. The work is phased by zone, work areas are separated with temporary partitions and dust control, and required exits and fire protection stay in service as the code requires. Noisy or dusty tasks can be scheduled outside business hours where the building allows it.

Our page on renovating occupied premises goes deeper into how that phasing works.

Permits, design review and the architect question

Whether a renovation needs a permit depends on the scope. Work that touches partitions, exits, plumbing, ventilation, fire-rated assemblies or the occupancy classification generally does; a cosmetic refresh may not. In Montréal, applications are centralised on the Allégo platform, the decisions stay with the borough, and the City now holds boroughs to a 120-day maximum issuance period: a ceiling, not a promise. Storefront and façade work can trigger PIIA review through the borough's comité consultatif d'urbanisme (CCU); in Ville-Marie, even installing a sign can. Our guide to commercial building permits in Montréal walks through the sequence.

On design: interior modifications that don't change the use or affect the structure, fire separations or the envelope stay outside the Architects Act, and we carry them in full. When a building is subject to the Act, an OAQ-member architect directs the design from the outset and we coordinate. Our guide to architect or designer in Quebec explains where that line falls.

Industries we serve

The renovation process is the same on every project; the technical and regulatory reality changes by sector, and renovating a space that stays open carries its own operational one. Each of these pages covers what's specific to it.

Where we do this work

We renovate commercial premises across Greater Montréal. Permit rules and review steps differ from one borough or municipality to the next, so each area page covers how projects run there.

The in-house difference

Designed around the building you already have

Because we design in-house and build what we design, the renovation is drawn around the premises as they actually are (the existing services, the structure, the parts of the business that can't stop) and priced while it's drawn. It's how we've worked since 2002: the team that surveyed the building is the team building in it, so what turns up when the walls are opened is solved by the same people who drew the plan, not argued over between a designer and a contractor.

Frequently asked

Commercial Renovation — your questions, answered.

What's the difference between a commercial renovation and a tenant improvement?

A tenant improvement fits out a leased space for an incoming or expanding tenant, within the limits of the lease and the landlord's base-building rules. A commercial renovation works on the premises themselves: an office, shop, restaurant or clinic you own or already occupy, or an operating business being refreshed. The construction methods overlap; who decides, who approves and what sets the schedule are different.

Do I need a permit to renovate a commercial space in Montréal?

Often, yes. A building permit is generally required when the work touches partitions, exits, plumbing, ventilation, fire-rated assemblies or the occupancy classification; a purely cosmetic refresh may not need one. Storefront, façade and sign work can also require PIIA review before the permit is issued. Applications go through the Allégo platform, but requirements vary by borough, so the scope should be confirmed with the borough or municipality before construction.

Can my business stay open during the renovation?

Often, depending on the scope. The work is phased by zone, work areas are separated with temporary partitions and dust control, and required exits and fire protection stay in service. Noisy or dusty work can be scheduled outside business hours where the building allows it. Some tasks, such as tying into the building's sprinkler, fire alarm or electrical systems, may still need a short shutdown. Whether and how you can stay open is settled at the consultation, once the scope is known.

Will renovating mean bringing the whole building up to current code?

Not necessarily the whole building. Depending on the scope, the work may require bringing exits, fire separations and accessibility up to current code in the area being renovated. A change of use can add requirements the previous occupancy didn't face. The extent depends on the building and the scope, which is why we identify it during the site survey and confirm it with the municipality before construction.

Do I need an architect for a commercial renovation?

It depends on the building and the work. Interior modifications that don't change the use or affect the structure, fire separations or the envelope fall outside Quebec's Architects Act, and our designers carry them in full. When the building is subject to the Act, an OAQ-member architect must direct the design from the outset; we coordinate that work within the same project. We determine which side of the line your project falls on before design starts.

Who carries out the plumbing, electrical and ventilation work?

Licensed specialized subcontractors holding the RBQ licences those trades require. We select them, verify their licences, schedule and coordinate their work with the rest of the renovation, and oversee quality on site, so you deal with a single point of contact for the whole project.

Start a project

Have a space in mind? Let's design and build it.

Tell us about your project — commercial, retail, or residential — and we'll walk you through what design-build can deliver. Consultations across Greater Montréal.

Direct

(514) 697-1742info@indesignconstruction.ca

Service area

  • Montréal
  • South Shore / Rive-Sud
  • North Shore / Rive-Nord
  • Laval
  • Vaudreuil-Soulanges
  • West Island
Call (514) 697-1742