Service Areas
Where we work
Service Areas Across Greater Montréal
We design and build across Greater Montréal — but the permit and approval reality changes borough to borough and city to city. These pages cover what actually differs where we work, not a repeat of the service list.
More of Greater Montréal — Laval and the North Shore — is added here as each area's page is written. We work across all of it; ask us about yours.
Four kinds of jurisdiction, four permit paths
Greater Montréal isn't one permit system. Before scope, budget, or schedule, the first question on any project is what kind of jurisdiction governs the address — because that decides which by-laws apply, which office reviews the file, and whether the City of Montréal's rules are in play at all.
A Montréal borough
Saint-Laurent, Ville-Marie, Rosemont–La Petite-Patrie, Pierrefonds-Roxboro
Nineteen boroughs, each running its own permit process, fees, and PIIA triggers inside the City's framework. Applications are centralised on Allégo, and since January 2025 the City holds every borough to a 120-day maximum issuance period — a ceiling, not a promise.
Montréal's boroughsA demerged city on the island
Pointe-Claire, Dorval, Kirkland, Beaconsfield, Dollard-des-Ormeaux
Geographically on the island, legally outside the borough system. Each runs its own by-laws and its own permit process, and the City's 120-day cap doesn't govern it. In the West Island, a municipal line can run through a single commercial strip.
The West Island splitA city in the Longueuil agglomeration
Longueuil, Brossard, Saint-Lambert, Boucherville, Saint-Bruno-de-Montarville
Off the island, under one regional plan — the Schéma d'aménagement et de développement de l'agglomération de Longueuil — with each city keeping its own by-laws. The regional layer sets the frame; the municipality sets the detail.
The South ShoreAn off-island municipality in an MRC
Vaudreuil-Dorion, Saint-Lazare, Hudson, Rigaud, Les Cèdres
Each municipality in Vaudreuil-Soulanges runs on its own by-laws. Vaudreuil-Dorion, the largest, takes applications online only under zoning by-law 1872 and permits-and-certificates by-law 1274 — no permit is issued in person.
Vaudreuil-SoulangesCurrent as of 2026 — confirm with the borough or municipality.
What we check before we quote — wherever the address is
The checklist is the same everywhere; the answers aren't. These are the questions that move a schedule or a budget, and we answer them for your specific address before you see a number:
- Does the zoning permit your use? A change of use can open approvals a like-for-like fit-out never touches, so we confirm it with the municipality rather than infer it from the last tenant.
- Is there PIIA exposure? In a Montréal borough, a PIIA file routes through the comité consultatif d'urbanisme (CCU) to borough council — a calendar you don't control. Elsewhere, it depends on whether the municipality applies that review to your zone.
- Does the sign need its own approval? In Ville-Marie, a sign installation can itself trigger PIIA. Signage belongs in the schedule from the first week, not the last.
- How long is the permit good for? In Saint-Laurent, work must begin within three months of issuance or the permit becomes void — so we time the application to your real start date, not the day the drawings are finished.
- Which side of the Architects Act boundary is the work on? Interior modifications that don't change use or touch structure, fire separations, exits, or the envelope we carry in full; otherwise an OAQ-member architect directs the design from the outset.
Examples drawn from the area pages above. Current as of 2026 — confirm with the borough or municipality.
Why the address matters before you sign a lease
Because the permit path follows the municipal line, the same fit-out can run a different process, with different review layers, depending only on which unit you lease. In the West Island, two spaces in the same strip can sit under different rulebooks; a South Shore space answers to its own city's by-laws rather than Montréal's; a Vaudreuil-Dorion file never goes over a counter at all.
It's also why we're careful with numbers. The long permit timelines that get quoted — Ville-Marie's roughly 18 months to authorise new construction in 2023, for example — are new-construction figures, a slower track than an interior commercial fit-out. We use them to show that jurisdiction matters, never to set a fit-out schedule. What you get from us instead is the specific process for your address, confirmed before design starts.
We've been based at 8300 Chemin de la Côte-de-Liesse in Saint-Laurent since 2002. Our designers are APDIQ members, we build under our own RBQ licence, and the licensed specialized work — electrical, plumbing, HVAC, fire protection — is carried out by licensed subcontractors we coordinate.
Frequently asked
Permits across Greater Montréal, answered.
Does Montréal's 120-day permit cap apply across Greater Montréal?
No. It's a Ville de Montréal measure, effective January 2025, that holds the City's own 19 boroughs — Saint-Laurent, Pierrefonds-Roxboro, and L'Île-Bizard–Sainte-Geneviève among them — to a 120-day maximum issuance period. Demerged island cities such as Pointe-Claire or Dorval, the cities of the Longueuil agglomeration, and municipalities like Vaudreuil-Dorion run their own processes under their own by-laws. Even inside Montréal, read 120 days as a ceiling, not a promise. (Current as of 2026 — confirm with the borough or municipality.)
Where does a commercial permit application actually go?
It depends on the jurisdiction. Montréal borough applications are centralised on the City's Allégo platform; in Saint-Laurent, the borough's Division des permis et des inspections at 777 boulevard Marcel-Laurin handles the file. Vaudreuil-Dorion takes applications online only, through its portal. On the South Shore, Longueuil issues permits through its Direction de l'aménagement et de l'urbanisme, and each of the other agglomeration cities applies its own by-laws. (Current as of 2026 — confirm with the borough or municipality.)
Does the municipality change whether I need an architect?
No — the work does. Quebec's Architects Act applies the same way across every borough and city: interior modifications that don't change a building's use and don't affect its structure, fire separations, exits, or envelope fall outside it, and we carry them in full. New construction and other work subject to the Act gets an OAQ-member architect directing the design from the outset, wherever the address is.
Do you work outside the areas listed here?
Yes. We work across Greater Montréal, including Laval and the North Shore, whose pages are still being written. Wherever the address is, we confirm the municipality's specific requirements before we quote — we don't assume one city's rules carry over to the next.
Start a project
Have a space in mind? Let's design and build it.
Tell us about your project — commercial, retail, or residential — and we'll walk you through what design-build can deliver. Consultations across Greater Montréal.
Direct
(514) 697-1742info@indesignconstruction.caService area
- Montréal
- South Shore / Rive-Sud
- North Shore / Rive-Nord
- Laval
- Vaudreuil-Soulanges
- West Island






