Commercial Fit-Out Cost per Square Foot in Montréal (2026)
The first question on almost every commercial project is the same: what will this cost per square foot? The honest answer is a range, and the range is wide, because a fit-out's cost is set less by its size than by what the space has to do. A dry office and a restaurant of the same size can sit at opposite ends of the market. This guide gathers the per-square-foot ranges published for the Québec market, explains what pushes a project up or down within them, covers the landlord's contribution, and shows where the budget is actually won or lost.
The figures below are published market ranges from third-party sources, not a quote from IN Design & Construction. Your project's cost depends on your space, its condition and your scope. We price from your drawings, not from a per-square-foot table.
Published cost ranges by type of space
Two Québec renovation guides published in August 2026, RenoQuotes in English and Soumission Rénovation in French, give the same per-square-foot ranges for commercial fit-outs. They're a reasonable starting point for a first budget conversation, and both sources stress that they're indicative, not a standard.
| Type of space | Published range | What usually decides where you land |
|---|---|---|
| Standard office | About $95–$150 / sq ft | How many enclosed rooms, how much of the existing ceiling, lighting and ventilation can stay |
| High-end office | About $150–$250+ / sq ft | Finish level, custom millwork, glass partitions, meeting-room technology |
| Retail store | $60–$140 / sq ft | Storefront and signage, display millwork, lighting, how much the landlord delivers |
| Restaurant or café | $150–$350+ / sq ft | Kitchen exhaust and fire suppression, plumbing and drainage, electrical or gas capacity |
| Medical or dental clinic | About $150–$350+ / sq ft | Equipment, specialized plumbing, sanitary requirements and technical installations |
Sources: RenoQuotes and Soumission Rénovation, both dated August 2026, consulted November 22, 2026. Ranges are before taxes and vary with the building, its condition and the scope.
Notice how much the ranges overlap. A plain clinic can cost less than an ambitious office. The type of space sets the floor; the decisions below set the number.
What actually moves the number
Most of the gap between the bottom and the top of a range comes from a handful of items. Knowing them early is what lets you choose a space, or a scope, that fits the budget instead of discovering the cost after the lease is signed.
- Mechanical systems and ventilation. A change of use can mean modifying the existing system, adding ventilation capacity or new rooftop units. The sources name ventilation upgrades as one of the largest single costs on many projects.
- Kitchen exhaust. For a restaurant, the hood, the ductwork and the fire-suppression system are a major line on their own. Their cost depends on the cooking line, the building and the route the exhaust has to take.
- Electrical and gas capacity. A clinic or kitchen with demanding equipment may need more electrical capacity than the space was built for. Work on the service can involve Hydro-Québec or Énergir, with connection costs and equipment lead times of their own.
- Plumbing and drainage. The number of fixtures, where the floor drains are and whether the slab has to be opened all matter. This is why clinics and restaurants sit at the top of the table.
- Washrooms and accessibility. Depending on the scope, the work may require bringing exits, fire separations and accessibility up to current code, which can mean an accessible washroom or a reworked entrance.
- Millwork and finishes. Custom reception desks, display fixtures and cabinetry are often what the customer sees most. They're also a schedule item, since fabrication follows approved shop drawings.
- Permits and professional fees. Drawings, any engineering the work needs, and municipal permit fees are real costs that a per-square-foot figure for construction alone may not include.
- Occupied premises and after-hours work. If the business stays open, phasing the work by zone, protecting the areas still in use and scheduling noisy tasks outside business hours all add time and cost.
The landlord's allowance: what it is and how it's paid
On a leased space, part of the fit-out can be paid by the landlord through a tenant improvement allowance. It's a financial contribution toward the work the tenant needs to operate. According to both sources, allowances of roughly $10 to $60 per square foot are seen in some Montréal office segments, but the amount is fully negotiable. It depends on the market, the building's class, the length of the lease, the tenant's credit and the condition of the space.
The contribution doesn't always arrive as a cheque. The sources describe three common forms:
- A direct allowance, paid as a fit-out credit on presentation of invoices.
- A free-rent period while construction is under way.
- Fit-out costs financed by the landlord and amortized into the base rent.
What to settle before you sign the lease
The allowance is only half the question. The other half is what the landlord delivers and what the lease expects back from you. A few points are worth settling while you still have leverage:
- The delivery condition. A shell space gives you the most freedom but leaves more of the cost and the overrun risk with you. A space the landlord finishes to agreed plans needs less capital up front but limits your choices to the building's standards.
- What the base building includes. Ventilation, sprinklers, washrooms and electrical service may or may not be ready for your use, and each one changes the budget.
- The landlord's design criteria and approval process, so the drawings are prepared to the rules they'll be reviewed against.
- When the allowance is paid. If it's paid on invoices, you carry the cost until it's reimbursed.
- What happens at the end of the lease. Some leases require the tenant to remove certain improvements and return the space to its original condition.
Get a realistic budget for your intended use before the lease is final. A per-square-foot figure is a starting point; a number priced from a layout for that specific space is what you negotiate with. Lease terms are a legal matter: have your lease reviewed by your own advisor.
Keeping the cost under control: design-build or the traditional route
How the project is delivered affects when you learn the real cost. In the traditional route, a designer completes the drawings and they're then tendered to builders. Competitive tendering on a fixed scope can produce a lower construction price, but the number only arrives once the design is done, and a high bid can send you back to redesign.
In design-build, the builder prices the work while the design develops, so cost problems surface while they're still changes on paper. That gives you cost certainty earlier, not a guaranteed lower number, and we don't publish savings percentages. Our design-build vs. traditional guide sets out both routes honestly, including when the traditional one is the better choice.
Permits and approvals belong in the budget
Most commercial fit-outs need a building permit, and some need more. In Montréal, applications go through the City's Allégo platform and the decisions stay with the borough. The City now holds boroughs to a 120-day maximum for permit issuance: a ceiling, not a promise. Storefront and façade work can trigger an architectural review (PIIA), and in Ville-Marie, even installing a sign can.
Permit fees follow the municipality's own tariff, and we list Montréal's on our permits page rather than repeat them here. The bigger budget item is often time: a lease that starts paying rent before the permit is issued. Our guide to commercial permits in Montréal covers the process, the review steps and what to have ready.
How we price a project
We don't publish a price list, because a per-square-foot rate quoted before we've seen the space would just be another range. We price from a layout for your actual space, built up from the items above: what the building already has, what your use needs, and what the permit and lease require.
Because design and construction sit with one team, the estimate is updated as the drawings develop, so the number you approve is tied to the drawings that will be built. The work is carried out under our RBQ licence, and licensed specialized subcontractors carry out the plumbing, electrical, ventilation and fire-protection work, which we coordinate. A first consultation is free.
General information on commercial fit-out costs, current as of November 2026. The ranges come from the third-party sources linked above and are not a quote; confirm costs for your specific space with a priced estimate, and have lease terms reviewed by your own advisor.
Frequently asked
Fit-out costs — your questions, answered.
How much does a commercial fit-out cost per square foot in Montréal?
Published market ranges from August 2026 put a standard office at about $95–$150 per square foot, a high-end office at about $150–$250 or more, retail at $60–$140, and restaurants and medical or dental clinics at $150–$350 or more. They're indicative only: the condition of the space and your scope decide where a project lands.
Why do restaurants and clinics cost so much more than offices?
Because of what's behind the walls. A restaurant needs kitchen exhaust, fire suppression, plumbing and often more electrical or gas capacity. A clinic needs specialized plumbing, equipment rough-ins and sanitary finishes. These systems are carried out by licensed specialized subcontractors and are what push both types toward the top of the range.
What is a tenant improvement allowance, and how much do landlords offer?
It's the landlord's contribution toward the work a tenant needs to operate. It can be paid as a credit on invoices, as free rent during construction, or financed into the base rent. Published sources report roughly $10–$60 per square foot in some Montréal office segments, but every allowance is negotiated and depends on the building, the lease and the tenant.
Does design-build cost less than hiring a designer and a contractor separately?
Not necessarily. Competitive tendering on completed drawings can produce a lower construction price. Design-build's advantage is that the cost is priced while the design develops, so you learn the real number earlier and face fewer late changes. We don't publish savings percentages because the outcome depends on the project.
Are permits and professional fees included in a per-square-foot cost?
Often not. Many published figures describe construction only. Drawings, any engineering the work requires and municipal permit fees are separate costs, and time spent waiting for a permit can cost rent. Ask what a figure includes before comparing it with another.
Start a project
Have a space in mind? Let's design and build it.
Tell us about your project — commercial, retail, or residential — and we'll walk you through what design-build can deliver. Consultations across Greater Montréal.
Direct
(514) 697-1742info@indesignconstruction.caService area
- Montréal
- South Shore / Rive-Sud
- North Shore / Rive-Nord
- Laval
- Vaudreuil-Soulanges
- West Island